Wind Turbines
Wind turbines—like windmills—are mounted on a tower to capture the most energy. At 100 feet or more aboveground, they can take advantage of the faster and less turbulent wind. Turbines catch the wind's energy with their propeller-like blades. Two or three blades are usually mounted on a shaft to form a rotor.
A blade acts much like an airplane wing. When the wind blows, a pocket of low-pressure air forms on the downwind side of the blade. The low-pressure air pocket then pulls the blade toward it, causing the rotor to turn. This is called lift. The force of the lift is actually much stronger than the wind's force against the front side of the blade, which is called drag. The combination of lift and drag causes the rotor to spin like a propeller, and the turning shaft spins a generator to make electricity.
Land-Based Wind Energy
Wind turbines can be used as stand-alone applications; or connected to a utility power grid; or combined with a photovoltaic (solar cell) system. For utility-scale (megawatt-sized) sources of wind energy, a large number of wind turbines are usually built close together to form a wind plant, also referred to as a wind farm. Several electricity providers today use wind plants to supply power to their customers.
Wind Projects
To develop a wind project, developers must obtain legal rights to the land on which the wind turbines will be placed. These rights may be in the form of a purchase of the land; a lease of the land; or easement to use the land.
The process of securing these rights for a wind energy project may begin with an option agreement—an exclusive right to conduct due diligence on the available wind resources, property conditions, and energy market until the developer is ready to move forward with project development.
The most common land agreement for a wind energy project is a lease. Leases allow the developer to spread the payments over the life of the project to minimize upfront costs. And since the wind project facilities occupy only a small portion of the land, landowners can continue existing land uses, while adding an additional revenue source with a wind energy lease.
A utility company (utility) will often require that the utility or the developer own the land where a utility-owned substation will be located. If the project includes construction of a new utility-owned substation, the developer or the utility will usually negotiate a purchase agreement directly with a landowner.
In New Mexico (NM), wind turbines are subject to various regulations and statutes that govern their installation and operation. Developers looking to establish wind projects must navigate legal processes to secure rights to the land, which can include purchasing the land, leasing it, or obtaining an easement. The initial step often involves an option agreement, allowing the developer to assess the wind resources and other property conditions. Leases are common for wind energy projects, as they enable developers to distribute costs over the project's lifespan and allow landowners to maintain their existing land uses while earning additional income. For utility-scale projects, which may involve the construction of new substations, developers or utilities typically negotiate directly with landowners for the purchase of the necessary land. In NM, wind energy projects must also comply with state-specific environmental regulations, zoning laws, and any federal laws that apply to ensure the responsible development of wind energy resources.