Sec. 4. (a) The commissioner, on behalf of the board, may conduct a public hearing at a time and place to be determined by the department on the environmental effects of the proposed operation.
(b) A person affected by the proposed construction may participate in the hearing to the extent and in the manner that the board prescribes.
[Pre-1996 Recodification Citation: 13-7-9-3.]
As added by P.L.1-1996, SEC.5. Amended by P.L.133-2012, SEC.106.