Sec. 3. A person proposing to construct:
(1) a nuclear powered generating facility; or
(2) a nuclear fuel reprocessing plant;
shall file with the board an environmental feasibility report, on a form prescribed by the board, concurrently with the filing of the preliminary safety analysis required to be filed with the United States Atomic Energy Commission.
[Pre-1996 Recodification Citation: 13-7-9-2.]
As added by P.L.1-1996, SEC.5. Amended by P.L.133-2012, SEC.105.