20.867 Building commission. There is appropriated to the building commission for the following programs:
(1) State office buildings.
(a) Principal repayment and interest; housing of state agencies. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the housing of state agencies and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(b) Principal repayment and interest; capitol and executive residence. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing building projects at the capitol and executive residence and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(2) All state-owned facilities.
(b) Asbestos removal. The amounts in the schedule for the removal of asbestos from state-owned facilities. The amounts provided under this paragraph shall be transferred to the state building trust fund.
(c) Hazardous materials removal. The amounts in the schedule for the removal of hazardous materials from state-owned facilities. The amounts provided under this paragraph shall be transferred to the state building trust fund.
(f) Facilities preventive maintenance. The amounts in the schedule for the purposes of carrying out the long-range building program under s. 13.48 as it relates to preventive maintenance of state-owned facilities. The amounts provided under this paragraph shall be transferred to the state building trust fund.
(q) Building trust fund. As a continuing appropriation, all moneys not otherwise appropriated from the state building trust fund for purposes of carrying out the long-range building program under s. 13.48.
(r) Planning and design. As a continuing appropriation from the building trust fund, any moneys allocated by the building commission for advance planning and all moneys received as reimbursement for building trust fund advances made for planning and design under this paragraph. The governor, upon the approval of the building commission, shall authorize the release of funds from this appropriation for advance planning, preliminary studies and design and may transfer funds from this appropriation to other accounts within the building trust fund.
(u) Aids for buildings. Unless otherwise provided by law all moneys received from the federal government or from other sources for the construction, remodeling, repairing, equipment or otherwise improving any of the state's buildings or institutions shall be paid into the state building trust fund and are appropriated therefrom to the proper department for the purposes for which received, as certified by the governor. The state of Wisconsin hereby assents to the provisions of any act of congress making such funds available to this state for such purposes. When the legislature is not in session or during any recess thereof, the governor is authorized on behalf of the state to accept such federal or other moneys upon such terms and conditions as the governor deems advisable and as provided in s. 13.48. Specifically excluded from this subsection are all moneys received under s. 20.485 (1) (m) or received in connection with projects already started in other funds. Such moneys shall be credited to the respective fund from which such projects were heretofore started.
(v) Building program funding contingency. As a continuing appropriation, the amounts in the schedule from interest earnings of the capital improvement fund accrued before October 1, 1983, for minimum maintenance and health and safety, energy conservation, advanced planning and minor projects.
(w) Building program funding. As a continuing appropriation, the amounts in the schedule from interest earnings of the capital improvement fund accrued before October 1, 1983, as well as earnings on those earnings, for minimum maintenance projects.
(3) State building program. In addition to such other appropriations as are made by law:
(a) Principal repayment and interest. A sum sufficient to pay all principal repayment and interest costs on tax-supported borrowing which is not initially allocable to the respective programs and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(b) Principal repayment and interest. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing capital improvements for other public purposes authorized by law but not otherwise specified in this chapter and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bb) Principal repayment, interest and rebates; AIDS Network, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction and renovation of facilities and purchase of equipment for the AIDS Network, Inc., to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bc) Principal repayment, interest and rebates; Grand Opera House in Oshkosh. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the repair and restoration of the Grand Opera House in Oshkosh, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bd) Principal repayment, interest and rebates; Aldo Leopold climate change classroom and interactive laboratory. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a climate change classroom and interactive laboratory that will border the cities of Madison and Monona, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(be) Principal repayment, interest and rebates; Bradley Center Sports and Entertainment Corporation. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the capital maintenance and repair of a sports and entertainment facility under ch. 232 for the Bradley Center Sports and Entertainment Corporation, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bf) Principal repayment, interest and rebates; AIDS Resource Center of Wisconsin, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction and renovation of facilities and purchase of equipment for the AIDS Resource Center of Wisconsin, Inc., as described in s. 13.48 (40), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bg) Principal repayment, interest, and rebates; Madison Children's Museum. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a museum facility in Madison for the Madison Children's Museum, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bh) Principal repayment, interest, and rebates; Myrick Hixon EcoPark, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of an educational center facility in the city of La Crosse, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bj) Principal repayment, interest and rebates; Lac du Flambeau Indian Tribal Cultural Center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a tribal cultural center for the Lac du Flambeau Band of Lake Superior Chippewa, as described in s. 13.48 (40m), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bL) Principal repayment, interest and rebates; family justice center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a facility, as described in s. 13.48 (39i), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bm) Principal repayment, interest, and rebates; HR Academy, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a youth and family center for HR Academy, Inc., in the city of Milwaukee, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the construction of a youth and family center for the HR Academy, Inc., and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bn) Principal repayment, interest and rebates; Hmong cultural center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the purchase or construction of a Hmong cultural center in La Crosse County, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the purchase or construction of the center, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bq) Principal repayment, interest and rebates; children's research institute. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a children's research institute in the city of Wauwatosa, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the construction of the institute, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(br) Principal repayment, interest and rebates. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the youth activities center specified in s. 13.48 (34), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the construction of the youth activities center, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bt) Principal repayment, interest, and rebates; Wisconsin Agriculture Education Center, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the center as described in s. 13.48 (28r), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bu) Principal repayment, interest and rebates; Civil War exhibit at the Kenosha Public Museums. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a Civil War exhibit as part of the Kenosha Public Museums, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the construction of the exhibit, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bv) Principal repayment, interest, and rebates; Bond Health Center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing construction costs related to the Bond Health Center expansion specified in s. 13.48 (36p) (b), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the construction costs, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bw) Principal repayment, interest, and rebates; Eau Claire Confluence Arts, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the center as described in s. 13.48 (28p), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(bx) Principal repayment, interest, and rebates; Carroll University. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the facility as described in s. 13.48 (28m), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cb) Principal repayment, interest and rebates; Domestic Abuse Intervention Services, Inc. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction and remodel of a facility, as described in s. 13.48 (39j), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cd) Principal repayment, interest, and rebates; K I Convention Center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the expansion of the facility as described in s. 13.48 (39m), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cf) Principal repayment, interest, and rebates; Dane County; livestock facilities. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of facilities as described in s. 13.48 (39L), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(ch) Principal repayment, interest, and rebates; Wisconsin Maritime Center of Excellence. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the facility as described in s. 13.48 (39n), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cj) Principal repayment, interest, and rebates; Norskedalen Nature and Heritage Center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the development of the site as described in s. 13.48 (39o), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cq) Principal repayment, interest, and rebates; La Crosse Center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the remodeling and expansion of the La Crosse Center as specified in s. 13.48 (33e), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cr) Principal repayment, interest, and rebates; St. Ann Center for Intergenerational Care, Inc.; Bucyrus Campus. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the completion of the Bucyrus Campus of St. Ann Center for Intergenerational Care, Inc., as specified in s. 13.48 (33m), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cs) Principal repayment, interest, and rebates; Brown County innovation center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a science, technology, engineering, and mathematics innovation center as specified in s. 13.48 (33s), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cw) Principal repayment, interest, and rebates; projects. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a project under s. 13.48 (20m), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(cx) Principal repayment, interest, and rebates; center. A sum sufficient to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of a project under s. 13.48 (20s), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing the project, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(d) Interest rebates on obligation proceeds; general fund. A sum sufficient to make the payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of obligations paid into the general fund.
(e) Principal repayment, interest and rebates; parking ramp. A sum sufficient to guarantee full payment of principal and interest costs for the 1 West Wilson Street parking ramp in the city of Madison and to make full payment of the amounts determined by the building commission under s. 13.488 (1) (m) attributable to the proceeds of obligations incurred in financing that ramp if the moneys available in the appropriation account under s. 20.505 (5) (g) are insufficient to make full payment of those amounts. All amounts advanced under the authority of this paragraph shall be repaid to the general fund in installments to be determined jointly by the department of administration and the building commission.
(g) Principal repayment, interest and rebates; program revenues. From the appropriate program revenue accounts, a sum sufficient to pay all principal and interest costs on self-amortizing borrowing issued under s. 20.866 (2) which are not initially allocable to the respective programs, to make any payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of such borrowing, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(h) Principal repayment, interest, and rebates. A sum sufficient to guarantee full payment of principal and interest costs for self-amortizing or partially self-amortizing facilities enumerated under ss. 20.190 (1) (j), 20.245 (1) (j), 20.285 (1) (gj) and (je), 20.370 (7) (eq), 20.485 (1) (go), and 20.867 (3) (kd) if moneys available in those appropriations are insufficient to make full payment, to make full payment of the amounts determined by the building commission under s. 13.488 (1) (m) if the appropriation under s. 20.190 (1) (j), 20.245 (1) (j), 20.285 (1) (gj) and (je), 20.485 (1) (g), or 20.867 (3) (kd) is insufficient to make full payment of those amounts, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a). All amounts advanced under the authority of this paragraph shall be repaid to the general fund whenever the balance of the appropriation for which the advance was made is sufficient to meet any portion of the amount advanced. The department of administration may take whatever action is deemed necessary including the making of transfers from program revenue appropriations and corresponding appropriations from program receipts in segregated funds and including actions to enforce contractual obligations that will result in additional program revenue for the state, to ensure recovery of the amounts advanced.
(i) Principal repayment, interest and rebates; capital equipment. A sum sufficient to pay principal and interest on public debt contracted under s. 20.866 (2) (ym), to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations contracted under s. 20.866 (2) (ym) for programs financed from program revenue or program revenue — service appropriations, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a). All payments under this paragraph shall be repaid to the general fund from the revenues of state agencies for which capital equipment is financed under s. 20.866 (2) (ym).
(k) Interest rebates on obligation proceeds; program revenues. All moneys transferred from the appropriations under pars. (g) and (i) and ss. 20.190 (1) (j), 20.245 (1) (j), 20.285 (1) (gj), 20.410 (1) (ko) and 20.505 (5) (g) and (kc) to make the payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of obligations specified in those paragraphs.
(kd) Energy conservation construction projects; principal repayment, interest and rebates. All moneys received by the building commission from agencies, as defined in s. 16.70 (1e), in payment of assessments under s. 16.847 (3), for the purpose of reimbursing s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing energy conservation construction projects at state facilities, to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing energy conservation construction projects at state facilities, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(km) Aquaculture demonstration facility; principal repayment and interest. The amounts in the schedule to reimburse s. 20.866 (1) (u) for the payment of principal and interest costs incurred in financing the construction of the aquaculture demonstration facility enumerated under 1999 Wisconsin Act 9, section 9107 (1) (i) 3., to make the payments determined by the building commission under s. 13.488 (1) (m) that are attributable to the proceeds of obligations incurred in financing that facility, and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a). All moneys transferred from the appropriation account under s. 20.505 (8) (hm) 1c. shall be credited to this appropriation account. Notwithstanding s. 20.001 (3) (a), the unencumbered balance on June 30 of each year shall revert to the appropriation account under s. 20.505 (8) (hm).
(q) Principal repayment and interest; segregated revenues. From the appropriate segregated funds, a sum sufficient to pay all principal and interest costs on self-amortizing borrowing issued under s. 20.866 (2) which are not initially allocable to the respective programs and to make payments under an agreement or ancillary arrangement entered into under s. 18.06 (8) (a).
(r) Interest rebates on obligation proceeds; conservation fund. A sum sufficient to make the payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of obligations paid into the conservation fund.
(s) Interest rebates on obligation proceeds; transportation fund. A sum sufficient to make the payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of obligations paid into the transportation fund.
(t) Interest rebates on obligation proceeds; veterans trust fund. A sum sufficient to make the payments determined by the building commission under s. 13.488 (1) (m) on the proceeds of obligations paid into the veterans trust fund.
(w) Bonding services. From the capital improvement fund, a sum sufficient to pay the expenses of contracting and managing public debt and revenue obligations issued pursuant to ch. 18, for reimbursing the legislative audit bureau for providing opinion audits of financial statements and the general fund for bond counsel services under s. 165.25 (4) (b), and for the purchase of any higher education bonds presented for payment prior to maturity under s. 18.83.
(4) Capital improvement fund interest earnings.
(q) Funding in lieu of borrowing. As a continuing appropriation, all interest earnings of the capital improvement fund accrued after September 30, 1983, except interest earnings arising from the investment of proceeds of public debt contracted under s. 20.866 (2) (zn) and (zo) on and after March 24, 1985, to permit funding in lieu of borrowing for the purposes for which the contracting of public debt is authorized under s. 20.866 (2) before March 24, 1985, and under s. 20.866 (2) (s) to (zm) and (zz) on and after March 24, 1985, and under s. 20.866 (2) (s) to (tz), (ug) to (ut), (uv) to (zm) and (zz) on and after August 9, 1989; and to permit funding for the purposes for which the contracting of public debt is authorized under s. 20.866 (2) (u) and (uu), regardless of the borrowing limits under s. 20.866 (2) (u) and (uu), on and after August 9, 1989. Expenditures from this appropriation for each purpose under s. 20.866 (2) (s) to (zm) and (zz) may not exceed the net interest earnings attributable to the corresponding account created under s. 18.08 (1) (b). Net interest earnings shall be allocated quarterly to accounts created under s. 18.08 (1) (b), on the basis of the average daily balance of each account during the quarter, except that accounts with a negative average daily balance shall not receive any interest earnings for that quarter. Balances attributable to accounts created under s. 18.08 (1) (b) may temporarily be utilized to support the expenditures of other accounts, pending the sale of public debt to provide funds for the program purposes of other accounts. Notwithstanding s. 20.866 (2) (s) to (zm) and (zz) or any nonstatutory state building program project enumeration, this appropriation may be used in lieu of borrowing under s. 20.866 (2) (s) to (zm) and (zz) on and after March 25, 1985, and in lieu of borrowing under s. 20.866 (2) (s) to (tz), (ug) to (ut), (uv) to (zm) and (zz) on and after August 9, 1989; and may be used regardless of the borrowing limits under s. 20.866 (2) (u) and (uu) on and after August 9, 1989.
(r) Interest on veterans obligations. As a continuing appropriation, all interest earnings arising from the investment of proceeds of public debt contracted under s. 20.866 (2) (zn) and (zo) on and after March 24, 1985 and all amounts transferred under 1985 Wisconsin Act 6, section 27, to permit the payment of debt service on the public debt.
(5) Services to nonstate governmental units.
(g) Financial consulting services. All moneys received from local professional football stadium districts for financial consulting services provided under s. 18.03 (5s), to be used to provide those services.
History: 1971 c. 125; 1973 c. 90 ss. 132 to 140g; 1975 c. 39; 1977 c. 29 ss. 352m to 353m, 1654 (8) (c), 1656 (3); 1977 c. 418; 1979 c. 34 ss. 629 to 631, 677w; 1979 c. 102 s. 4; 1979 c. 176, 177, 221; 1981 c. 1, 20, 93; 1981 c. 314 s. 146; 1981 c. 317; 1983 a. 27; 1983 a. 36 s. 96 (3); 1985 a. 6, 29; 1985 a. 332 s. 253; 1987 a. 27, 399; 1989 a. 31, 46, 219, 359; 1991 a. 32, 39, 269; 1993 a. 16; 1995 a. 27; 1999 a. 9, 167; 2001 a. 16; 2003 a. 33; 2005 a. 25; 2007 a. 20; 2009 a. 28, 361; 2011 a. 32 ss. 574rm, 798y to 799r; 2013 a. 20; 2015 a. 55; 2017 a. 59; 2019 a. 9.