43.21A.610 Steam electric generating plant—Study—Construction.

WA Rev Code § 43.21A.610 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

RCW 43.21A.610 Steam electric generating plant—Study—Construction.

The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him or her to be feasible and operate it as a state owned facility.

[ 2009 c 549 § 5088; 1988 c 127 § 10; 1965 c 8 § 43.21.250. Prior: 1957 c 275 § 3. Formerly RCW 43.21.250.]