§ 55.1-1404. (Effective October 1, 2019) Energy submetering, energy allocation equipment, sewer and water submetering equipment, ratio utility billings systems; local government fees

VA Code § 55.1-1404 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

A. As used in this section:

"Building" means all of the individual units served through the same utility-owned meter within a building that is used as a nonresidential tenancy, including a building used as an office building or shopping center as those terms are defined in § 56-245.2.

"Campground" means the same as that term is defined in § 35.1-1.

"Campsite" means the same as that term is defined in § 35.1-1.

"Energy allocation equipment" means the same as that term is defined in § 56-245.2.

"Energy submetering equipment" has the same meaning ascribed to "submetering equipment" in § 56-245.2.

"Local government fees" means any local government charges or fees assessed against a building or campground, including stormwater, recycling, trash collection, elevator testing, or fire or life safety testing.

"Ratio utility billing system" means a program that utilizes a mathematical formula for allocating, among the tenants in a building or campground, the actual or anticipated water, sewer, electrical, oil, or natural gas billings billed to the building or campground owner from a third-party provider of the utility service. Permitted allocation methods may include formulas based on square footage, occupancy, number of bedrooms, or some other specific method agreed to by the building or campground owner and the tenant in the rental agreement or lease.

"Water and sewer submetering equipment" means equipment used to measure actual water or sewer usage in any nonresidential rental unit, as defined in § 56-245.2, when such equipment is not owned or controlled by the utility or other provider of water or sewer service that provides service to the building in which the nonresidential rental unit is located or campground where the campsite is located.

B. Energy submetering equipment, energy allocation equipment, water and sewer submetering equipment, or a ratio utility billing system may be used in a building or campground if clearly stated in the rental agreement or lease for the leased premises. All energy submetering equipment and energy allocation equipment shall meet the requirements and standards established and enforced by the State Corporation Commission pursuant to § 56-245.3.

C. If energy submetering equipment, water and sewer submetering equipment, or energy allocation equipment is used in any building or campground, the owner, manager, or operator of the building or campground shall bill the tenant for electricity, oil, natural gas, or water and sewer for the same billing period as the utility serving the building or campground, unless the rental agreement or lease expressly provides otherwise. The owner, manager, or operator of the building or campground may charge and collect from the tenant additional service charges, including monthly billing fees, account set-up fees, or account move-out fees, to cover the actual costs of administrative expenses and billing charged to the building or campground owner, manager, or operator by a third-party provider of such services, provided that such charges are agreed to by the building or campground owner and the tenant in the rental agreement or lease. The building or campground owner may require the tenant to pay a late charge of up to $5 if the tenant fails to make payment when due, which shall not be less than 15 days following the date of mailing or delivery of the bill sent pursuant to this section.

D. If a ratio utility billing system is used in any building or campground, in lieu of increasing the rent, the owner, manager, or operator of the building or campground may employ such a program that utilizes a mathematical formula for allocating, among the tenants in a building or campground, the actual or anticipated water, sewer, electrical, oil, or natural gas billings billed to the building or campground owner from a third-party provider of the utility service. The owner, manager, or operator of the building or campground may charge and collect from the tenant additional service charges, including monthly billing fees, account set-up fees, or account move-out fees, to cover the actual costs of administrative expenses and billings charged to the building or campground owner, manager, or operator by a third-party provider of such services, provided that such charges are agreed to by the building or campground owner and the tenant in the rental agreement or lease. The building or campground owner may require the tenant to pay a late charge of up to $5 if the tenant fails to make payment when due, which shall not be less than 15 days following the date of mailing or delivery of the bill sent pursuant to this section.

E. Energy allocation equipment shall be tested periodically by the owner, manager, or operator of the building or campground. Upon the request by a tenant, the owner shall test the energy allocation equipment without charge. The test conducted without charge to the tenant shall not be conducted more frequently than once in a 24-month period for the same tenant. The tenant or his designated representative may be present during the testing of the energy allocation equipment. A written report of the results of the test shall be made to the tenant within 10 working days after the completion of the test.

F. The owner of any building or campground shall maintain adequate records regarding energy submetering equipment, water and sewer submetering equipment, energy allocation equipment, or a ratio utility billing system. A tenant may inspect and copy the records for the leased premises during reasonable business hours at a convenient location within the building or campground. The owner of the building or campground may impose and collect a reasonable charge for copying documents, reflecting the actual costs of materials and labor for copying, prior to providing copies of the records to the tenant.

G. Notwithstanding any enforcement action undertaken by the State Corporation Commission pursuant to its authority under § 56-245.3, tenants and owners shall retain any private right of action resulting from any breach of the rental agreement or lease terms required by this section or § 56-245.3, if applicable, to the same extent as such actions may be maintained for breach of other terms of the rental agreement or lease under this chapter, if applicable. The use of energy submetering equipment, water and sewer submetering equipment, energy allocation equipment, or a ratio utility billing system is not within the jurisdiction of the Department of Agriculture and Consumer Services under Chapter 56 (§ 3.2-5600 et seq.) of Title 3.2.

H. In lieu of increasing the rent, the owner, manager, or operator of a building or campground may employ a program that utilizes a mathematical formula for allocating the actual or anticipated local government fees billed to the building or campground owner among the tenants in such building or campground if clearly stated in the rental agreement or lease for the leased premises. Permitted allocation methods may include formulas based upon square footage, occupancy, number of bedrooms, or some other specific method agreed to by the building or campground owner and the tenant in the rental agreement or lease. Such owner, manager, or operator of a building or campground may also charge and collect from each tenant additional service charges, including monthly billing fees, account set-up fees, or account move-out fees, to cover the actual costs of administrative expenses for administration of such a program.

I. Nothing in this section shall be construed to prohibit an owner, manager, or operator of a building or campground from including water, sewer, electrical, natural gas, oil, or other utilities in the amount of rent as specified in the rental agreement or lease.

1992, c. 766, § 55-226.2; 2003, c. 355; 2005, c. 278; 2010, c. 550; 2012, c. 338; 2014, c. 501; 2015, c. 596; 2017, c. 730; 2019, c. 712.