Section 204 - Application for a recovery permit -- Required information.

UT Code § 73-3b-204 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

(1) A person may file a recovery permit application with a recharge permit application.

(2) The application for obtaining a recovery permit shall include the following information: (a) the name and mailing address of the applicant; (b) a legal description of the location of the existing well or proposed new well from which the applicant intends to recover artificially recharged water; (c) a written consent from the owner of the recharge permit, if the applicant does not hold the recharge permit; (d) the name and mailing address of the owner of the land from which the applicant proposes to recover artificially recharged water; (e) the name or description of the artificially recharged groundwater aquifer which is the source of supply; (f) the purpose for which the artificially recharged water will be recovered; (g) the depth and diameter of the existing well or proposed new well; (h) a legal description of the area where the artificially recharged water is proposed to be used; (i) the design pumping capacity of the existing well or proposed new well; and (j) any other information including maps, drawings, and data that the state engineer requires.

(a) the name and mailing address of the applicant;

(b) a legal description of the location of the existing well or proposed new well from which the applicant intends to recover artificially recharged water;

(c) a written consent from the owner of the recharge permit, if the applicant does not hold the recharge permit;

(d) the name and mailing address of the owner of the land from which the applicant proposes to recover artificially recharged water;

(e) the name or description of the artificially recharged groundwater aquifer which is the source of supply;

(f) the purpose for which the artificially recharged water will be recovered;

(g) the depth and diameter of the existing well or proposed new well;

(h) a legal description of the area where the artificially recharged water is proposed to be used;

(i) the design pumping capacity of the existing well or proposed new well; and

(j) any other information including maps, drawings, and data that the state engineer requires.

(3) (a) A filing fee must be submitted with the application. (b) The state engineer shall establish the filing fee in accordance with Section 63J-1-504.

(a) A filing fee must be submitted with the application.

(b) The state engineer shall establish the filing fee in accordance with Section 63J-1-504.