Sec. 31.003. PERMIT FROM COMMISSION. A person desiring to drill, excavate, or otherwise construct a subsurface excavation may not begin construction without first obtaining a permit for the work from the commission.
Added by Acts 1989, 71st Leg., ch. 2, Sec. 15.02(a), eff. Aug. 28, 1989.