Sec. 121.503. REQUIREMENTS OF TEST. (a) The person responsible for a school facility shall perform the pressure test to determine whether the natural gas piping downstream of the school facility's meter holds at least normal operating pressure over a specified period determined by the railroad commission.
(b) During the pressure test, each system supply inlet and outlet in the school facility must be closed.
(c) At the request of a person responsible for a school facility, the railroad commission shall assist the person in developing a procedure for conducting the test.
Added by Acts 1999, 76th Leg., ch. 62, Sec. 18.14(a), eff. Sept. 1, 1999. Amended by Acts 2001, 77th Leg., ch. 1233, Sec. 74, eff. Sept. 1, 2001.