Sec. 37.156. INTERFERENCE WITH ANOTHER UTILITY. If an electric utility constructing or extending the utility's lines, plant, or system interferes or attempts to interfere with the operation of a line, plant, or system of another utility, the commission by order may:
(1) prohibit the construction or extension; or
(2) prescribe terms for locating the affected lines, plants, or systems.
Acts 1997, 75th Leg., ch. 166, Sec. 1, eff. Sept. 1, 1997.