Sec. 43.064. PERIOD FOR COMPLETION OF ANNEXATION. The annexation of an area must be completed within 90 days after the date the governing body institutes the annexation proceedings or those proceedings are void. Any period during which the municipality is restrained or enjoined by a court from annexing the area is not included in computing the 90-day period.
Added by Acts 1999, 76th Leg., ch. 1167, Sec. 9, eff. Sept. 1, 1999.
Amended by:
Acts 2017, 85th Leg., 1st C.S., Ch. 6 (S.B. 6), Sec. 23, eff. December 1, 2017.