Sec. 469.102. PROCEDURE FOR SUBMITTING PLANS AND SPECIFICATIONS. (a) The architect, interior designer, landscape architect, or engineer who has overall responsibility for the design of a constructed or reconstructed building or facility shall submit the plans and specifications required under Section 469.101.

(b) The person shall submit the plans and specifications not later than the 20th day after the date the person issues the plans and specifications. If plans and specifications are issued on more than one date, the person shall submit the plans and specifications not later than the 20th day after each date the plans and specifications are issued. In computing time under this subsection, a Saturday, Sunday, or legal holiday is not included.

(c) The owner of the building or facility may not allow an application to be filed with a local governmental entity for a building construction permit related to the plans and specifications or allow construction, renovation, or modification of the building or facility to begin before the date the plans and specifications are submitted to the department. On application to a local governmental entity for a building construction permit, the owner shall submit to the entity proof that the plans and specifications have been submitted to the department under this chapter.

(d) A public official of a political subdivision who is legally authorized to issue building construction permits may not accept an application for a building construction permit for a building or facility subject to Section 469.101 unless the official verifies that the building or facility has been registered with the department as provided by rule.

Added by Acts 2003, 78th Leg., ch. 1276, Sec. 9.005(a), eff. Sept. 1, 2003.

Amended by:

Acts 2009, 81st Leg., R.S., Ch. 342 (H.B. 1055), Sec. 1, eff. September 1, 2009.