Sec. 2176.107. PREREQUISITE TO UPGRADING OR REPLACING MAIL EQUIPMENT; COMPARISON AND ANALYSIS. (a) If the comptroller determines that upgrading existing mail production or processing equipment or purchasing new mail production or processing equipment is required to improve outgoing first-class mail practices of the comptroller or another state agency located in Travis County, the comptroller shall prepare a cost-benefit analysis demonstrating that the upgrade or purchase is more cost-effective than contracting with a private entity to provide the equipment or mail service.
(b) The comptroller shall approve the most cost-effective method.
Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995.
Amended by:
Acts 2019, 86th Leg., R.S., Ch. 1071 (H.B. 1524), Sec. 114, eff. September 1, 2019.