Sec. 153.403. DEMAND. (a) A limited partner may not institute a derivative proceeding until the 91st day after the date a written demand is filed with the limited partnership stating with particularity the act, omission, or other matter that is the subject of the claim or challenge and requesting that the limited partnership take suitable action.
(b) The waiting period required by Subsection (a) before a derivative proceeding may be instituted is not required or, if applicable, shall terminate if:
(1) the limited partner has been notified that the demand has been rejected by the limited partnership;
(2) the limited partnership is suffering irreparable injury; or
(3) irreparable injury to the limited partnership would result by waiting for the expiration of the 90-day period.
Acts 2003, 78th Leg., ch. 182, Sec. 1, eff. Jan. 1, 2006.
Amended by:
Acts 2019, 86th Leg., R.S., Ch. 899 (H.B. 3603), Sec. 27, eff. September 1, 2019.