34A-6-66. Promulgation of rules for waste tire stockpiling and processing facilities. Upon completion of the study pursuant to § 34A-6-65, the department shall determine the number of stockpiling facilities that are necessary; and the board shall promulgate rules pursuant to chapter 1-26 for waste tire stockpiling and processing facilities. The rules shall include the following:
(1) The prohibition of burning within one hundred yards of a tire stockpile;
(2) The maximum height, width, and length of a tire stockpile;
(3) Plans to control mosquitos and rodents;
(4) A facility closure plan;
(5) Specifications for fire lanes between stockpiles;
(6) Limitation of the total number of tires allowed at a single stockpile site;
(7) Criteria for the issuance of permits to qualified waste tire stockpiling and processing facilities. No waste tire stockpiling or processing may be done without a permit; and
(8) Appropriate waste tire processing methods.Source: SL 1992, ch 254, § 28.