Section 11-35-2910. Definitions of terms used in this article.

SC Code § 11-35-2910 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

(1) "Architect-engineer and land surveying services" are those professional services associated with the practice of architecture, professional engineering, land surveying, landscape architecture, and interior design pertaining to construction, as defined by the laws of this State, as well as incidental services that members of these professions and those in their employ may logically or justifiably perform, including studies, investigations, surveys, evaluations, consultations, planning, programming conceptual designs, plans and specifications, cost estimates, inspections, shop drawing reviews, sample recommendations, preparation of operating and maintenance manuals, and other related services.

(2) "Construction manager agent" means a business that has been awarded a separate contract with the governmental body to provide construction management services but not construction.

(3) "Construction manager at-risk" means a business that has been awarded a separate contract with the governmental body to provide both construction management services and construction using the construction management at-risk project delivery method. A contract with a construction manager at-risk may be executed before completion of design.

(4) "Construction management services" are those professional services associated with contract administration, project management, and other specified services provided in connection with the administration of a project delivery method defined in Section 11-35-3005 (Project Delivery Methods Authorized).

(5) "Construction management at-risk" means a project delivery method in which the governmental body awards separate contracts, one for architectural and engineering services to design an infrastructure facility and the second to a construction manager at-risk for both construction of the infrastructure facility according to the design and construction management services.

(6) "Design-bid-build" means a project delivery method in which the governmental body sequentially awards separate contracts, the first for architectural and engineering services to design an infrastructure facility and the second for construction of the infrastructure facility according to the design.

(7) "Design-build" means a project delivery method in which the governmental body enters into a single contract for design and construction of an infrastructure facility.

(8) "Design-build-finance-operate-maintain" means a project delivery method in which the governmental body enters into a single contract for design, construction, finance, maintenance, and operation of an infrastructure facility over a contractually defined period. Money appropriated by the State is not used to pay for a part of the services provided by the contractor during the contract period.

(9) "Design-build-operate-maintain" means a project delivery method in which the governmental body enters into a single contract for design, construction, maintenance, and operation of an infrastructure facility over a contractually defined period. All or a portion of the money required to pay for the services provided by the contractor during the contract period are either appropriated by the State before the award of the contract or secured by the State through fare, toll, or user charges.

(10) "Design requirements" means the written description of the infrastructure facility to be procured pursuant to this article, including:

(a) required features, functions, characteristics, qualities, and properties that are required by the State;

(b) the anticipated schedule, including start, duration, and completion; and

(c) estimated budgets as applicable to the specific procurement, for design, construction, operation, and maintenance. The design requirements may, but need not, include drawings and other documents illustrating the scale and relationship of the features, functions, and characteristics of the project.

(11) "Independent peer reviewer services" are additional architectural and engineering services that a governmental body shall acquire, as designated in the Manual for Planning and Execution of State Permanent Improvement, in design-build, design-build-operate-maintain, or design-build-finance-operate-maintain procurements. The function of the independent peer reviewer is to confirm that the key elements of the professional engineering and architectural design provided by the contractor are in conformance with the applicable standard of care. If a governmental body elects not to contract with the independent peer reviewer proposed by the successful offeror, the independent peer reviewer must be selected through competitive sealed proposals.

(12) "Infrastructure facility" means a building; structure; or networks of buildings, structures, pipes, controls, and equipment, or portion thereof, that provide transportation, utilities, public education, or public safety services. Included are government office buildings; public schools; courthouses; jails; prisons; water treatment plants, distribution systems, and pumping stations; wastewater treatment plants, collection systems, and pumping stations; solid waste disposal plants, incinerators, landfills, and related facilities; public roads and streets; highways; public parking facilities; public transportation systems, terminals, and rolling stock; rail, air, and water port structures, terminals, and equipment.

(13) "Operations and maintenance" means a project delivery method in which the governmental body enters into a single contract for the routine operation, routine repair, and routine maintenance of an infrastructure facility.

(14) "Proposal development documents" means drawings and other design-related documents that are sufficient to fix and describe the size and character of an infrastructure facility as to architectural, structural, mechanical and electrical systems, materials, and such other elements as may be appropriate to the applicable project delivery method.

HISTORY: 1981 Act No. 148, Section 1; 1997 Act No. 153, Section 1; 2008 Act No. 174, Section 11.

Editor's Note

2008 Act No. 174, Section 1, provides as follows:

"The General Assembly finds that:

"(1) it adopted a modified version of the 1979 ABA Model Procurement Code for State and Local Governments when it enacted 1981 Act No. 148. Since then, the ABA has revised its recommended model by adopting the 2000 ABA Model Procurement Code for State and Local Governments, which it developed in cooperation with, among others, the National Association of State Procurement Officials, the National Institute of Governmental Purchasing, the American Consulting Engineers Council, the Design Professionals Coalition, the Council on the Federal Procurement of A/E Services, the Engineers Joint Contracts Document Committee, and the National Society of Professional Engineers. One of the primary goals of the revision project was to encourage the competitive use of new forms of project delivery in public construction procurement; and

"(2) it is the intent of the General Assembly to facilitate the use of these alternate forms of project delivery by adopting, as modified herein, those portions of the new model code related to Article 5 (Procurement of Infrastructure Facilities and Services) of the model code. To that end, the relevant official comments to the model code, and the construction given to the model code, should be examined as persuasive authority for interpreting and construing the new code provisions created by this act."

2008 Act No. 174, Section 21, provides as follows:

"This act takes effect upon approval by the Governor and applies to solicitations issued on or after January 1, 2008."

Subarticle 3

Construction Services