Section 4305 - Scope of work

12 PA Cons Stat § 4305 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

(a) Requirement.--A program shall require for each proposed qualified project a scope of work, energy baseline or water usage baseline and the projected energy savings or water usage reductions in order to establish the viability of the qualified project and the projected energy savings or water usage reductions.

(b) Verification of completion.--After a qualified project is completed, the municipality or county shall obtain verification from the real property owner and from an independent professional inspector or building code official that the qualified project was properly completed.