Section 215.274 - Associated transmission lines necessary for public service; criteria; mitigating impact of facility.

OR Rev Stat § 215.274 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

(2) An associated transmission line is necessary for public service if an applicant for approval under ORS 215.213 (1)(c)(B) or 215.283 (1)(c)(B) demonstrates to the governing body of a county or its designee that the associated transmission line meets:

(a) At least one of the requirements listed in subsection (3) of this section; or

(b) The requirements described in subsection (4) of this section.

(3) The governing body of a county or its designee shall approve an application under this section if an applicant demonstrates that the entire route of the associated transmission line meets at least one of the following requirements:

(a) The associated transmission line is not located on high-value farmland, as defined in ORS 195.300, or on arable land;

(b) The associated transmission line is co-located with an existing transmission line;

(c) The associated transmission line parallels an existing transmission line corridor with the minimum separation necessary for safety; or

(d) The associated transmission line is located within an existing right of way for a linear facility, such as a transmission line, road or railroad, that is located above the surface of the ground.

(4)(a) Except as provided in subsection (3) of this section, the governing body of a county or its designee shall approve an application under this section if, after an evaluation of reasonable alternatives, the applicant demonstrates that the entire route of the associated transmission line meets, subject to paragraphs (b) and (c) of this subsection, two or more of the following factors:

(A) Technical and engineering feasibility;

(B) The associated transmission line is locationally dependent because the associated transmission line must cross high-value farmland, as defined in ORS 195.300, or arable land to achieve a reasonably direct route or to meet unique geographical needs that cannot be satisfied on other lands;

(C) Lack of an available existing right of way for a linear facility, such as a transmission line, road or railroad, that is located above the surface of the ground;

(D) Public health and safety; or

(E) Other requirements of state or federal agencies.

(b) The applicant shall present findings to the governing body of the county or its designee on how the applicant will mitigate and minimize the impacts, if any, of the associated transmission line on surrounding lands devoted to farm use in order to prevent a significant change in accepted farm practices or a significant increase in the cost of farm practices on the surrounding farmland.

(c) The governing body of a county or its designee may consider costs associated with any of the factors listed in paragraph (a) of this subsection, but consideration of cost may not be the only consideration in determining whether the associated transmission line is necessary for public service. [2013 c.242 §2]

Note: 215.274 was added to and made a part of ORS chapter 215 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.