§ 87-126 - Notification required when damage is done.

NC Gen Stat § 87-126 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

87-126. Notification required when damage is done.

(a) The excavator performing an excavation or demolition that results in any damage to a facility shall immediately upon discovery of the damage notify the Notification Center and the facility operator, if known, of the location and nature of the damage. The excavator shall allow the operator reasonable time to accomplish necessary repairs before completing the excavation or demolition in the immediate area of the facility. The excavator shall delay any backfilling in the immediate area of the damaged facility until authorized by the operator. The operator or qualified personnel authorized by the operator shall repair any damage to the facility.

(b) An excavator who is responsible for an excavation or demolition where any damage to a facility results in the discharge of electricity or escape of any flammable, toxic, or corrosive gas or liquid, or that endangers life, health, or property shall immediately notify emergency responders, including 911 services, the Notification Center, and the facility operator. The excavator shall take reasonable measures to protect himself or herself, other persons in immediate danger, members of the general public, property, and the environment until the operator or emergency responders arrive and complete an assessment of the situation.