§ 136-44.7D - Bridge construction guidelines.

NC Gen Stat § 136-44.7D (2019) (N/A)
Copy with citation
Copy as parenthetical citation

136-44.7D. Bridge construction guidelines.

A bridge crossing rivers and streams in watersheds shall be constructed to accommodate the hydraulics of a flood water level equal to the water level projected for a 100-year flood for the region in which the bridge is built. The bridge shall be built without regard for the riparian buffer zones as designated by the Department of Environmental Quality, Division of Water Resources. No Memorandums of Agreement may be made between Departments to bypass this construction mandate. No agency rules shall be enacted contrary to this section.