Section 13-1-120 - Competitive sealed qualifications-based proposals; architects; engineers; landscape architects; surveyors; selection process.

NM Stat § 13-1-120 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

A. For each proposed state public works project, local public works project or construction management contract, the architect, engineer, landscape architect, construction management and surveyor selection committee, state highway and transportation department selection committee or local selection committee, as appropriate, shall evaluate statements of qualifications and performance data submitted by at least three businesses in regard to the particular project and may conduct interviews with and may require public presentation by all businesses applying for selection regarding their qualifications, their approach to the project and their ability to furnish the required services.

B. The appropriate selection committee shall select, ranked in the order of their qualifications, no less than three businesses deemed to be the most highly qualified to perform the required services, after considering the following criteria together with any criteria, except price, established by the using agency authorizing the project:

(1) specialized design and technical competence of the business, including a joint venture or association, regarding the type of services required;

(2) capacity and capability of the business, including any consultants, their representatives, qualifications and locations, to perform the work, including any specialized services, within the time limitations;

(3) past record of performance on contracts with government agencies or private industry with respect to such factors as control of costs, quality of work and ability to meet schedules;

(4) proximity to or familiarity with the area in which the project is located;

(5) the amount of design work that will be produced by a New Mexico business within this state;

(6) the volume of work previously done for the entity requesting proposals which is not seventy-five percent complete with respect to basic professional design services, with the objective of effecting an equitable distribution of contracts among qualified businesses and of assuring that the interest of the public in having available a substantial number of qualified businesses is protected; provided, however, that the principle of selection of the most highly qualified businesses is not violated; and

(7) notwithstanding any other provisions of this subsection, price may be considered in connection with construction management contracts, unless the services are those of an architect, engineer, landscape architect or surveyor.

C. Notwithstanding the requirements of Subsections A and B of this section, if fewer than three businesses have submitted a statement of qualifications for a particular project, the appropriate committee may:

(1) rank in order of qualifications and submit to the secretary or local governing authority of the public body for award those businesses which have submitted a statement of qualifications; or

(2) recommend termination of the selection process pursuant to Section 13-1-131 NMSA 1978 and sending out of new notices of the resolicitation of the proposed procurement pursuant to Section 13-1-104 NMSA 1978. Any proposal received in response to the terminated solicitation is not public information and shall not be made available to competing offerors.

D. The names of all businesses submitting proposals and the names of all businesses, if any, selected for interview shall be public information. After an award has been made, the appropriate selection committee's final ranking and evaluation scores for all proposals shall become public information. Businesses which have not been selected for contract award shall be so notified in writing within fifteen days after an award is made.

History: Laws 1984, ch. 65, § 93; 1987, ch. 301, § 2; 1989, ch. 69, § 12; 1993, ch. 72, § 3; 1997, ch. 171, § 6.

The 1997 amendment, effective June 20, 1997, in Subsection A, inserted "or construction management contract" and "construction management" and made related stylistic changes; inserted "appropriate" in Subsections B and C; inserted "including any consultants, their representatives, qualifications and locations, to" in Paragraph B(2); substituted "violated" for "violate" at the end of Paragraph B(6); added Paragraph B(7) and made related stylistic changes; inserted "governing authority of the" in Paragraph C(1); in paragraph C(2), inserted "pursuant to Section 13-1-131 NMSA 1978" and "resolicitation of the" and added the last sentence; and in Subsection D, inserted "the appropriate selection committee's" and "for contract award", and substituted "fifteen days" for "twenty-one days" near the end of the subsection.

The 1993 amendment, effective June 18, 1993, inserted "state highway and transportation department selection committee" in Subsection A.