An agreement for the purchase of a distributed generation system must include, without limitation, the following information in at least 10-point font:
1. The name, mailing address, telephone number, electronic mail address and number of the contractor’s license of the solar installation company.
2. The name, mailing address, telephone number and electronic mail address of:
(a) The purchaser of the distributed generation system; and
(b) The name, mailing address, telephone number and electronic mail address of the person responsible for all maintenance of the distributed generation system, if different from the solar installation company.
3. A description, which includes, without limitation, any assumptions, concerning the design and installation of the distributed generation system. Such a description must include, without limitation:
(a) The size of the distributed generation system;
(b) The estimated amount of production for the distributed generation system in the first year of operation; and
(c) The estimated annual degradation to the distributed generation system.
4. The total cost of the distributed generation system.
5. An estimated timeline for the installation of the distributed generation system.
6. A payment schedule, including, without limitation:
(a) The due dates for any deposit; and
(b) Any subsequent payments that are not to exceed the total system cost stated on the cover page pursuant to NRS 598.9813.
7. The granting to the purchaser the right to rescind the agreement for a period ending not less than 3 business days after the agreement is signed.
8. A copy of the warranty for the distributed generation system.
9. A disclosure notifying the purchaser of the transferability of the obligations under the warranty to a subsequent purchaser.
10. The identification of any incentives included in the calculation of the total cost of the distributed generation system.
11. A description of any guarantee of the performance of the distributed generation system.
12. A signature block that is signed and dated by the purchaser of the distributed generation system and the solar installation company.
13. A description of the basis for any estimates of savings that were provided to the purchaser, if applicable.
14. A disclosure concerning the retention of any portfolio energy credits, if applicable.
(Added to NRS by 2017, 4272)