Section 541.072 — Special Limitation.

MN Stat § 541.072 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

An action to recover damages heretofore caused by the establishment of a street or highway grade or a change in the originally established grade may be brought within the time prescribed in section 541.07 or within six months after April 25, 1955, whichever is the longer period.

History: 1955 c 843 s 2