Any electric vehicle infrastructure installed in this state must without significant upgrading of the electric vehicle infrastructure:
(1) allow for utilization of the electric vehicle infrastructure by any make, model, or type of electric vehicle;
(2) be in compliance with section 326B.35 and standards set by the Society of Automotive Engineers; and
(3) be capable of providing bidirectional charging, once electrical utilities achieve a cost-effective capability to draw electricity from electric vehicles connected to the utility grid.
History: 2009 c 134 s 6