(a) When a potential receptor survey is conducted for a petroleum tank release as provided in agency guidance documents, the tank owner must provide information on the results of the survey, reports of all releases, and any corrective actions, as defined in section 115C.02, that are related to the petroleum tank release in an understandable manner to residents contacted in the survey. The information may be provided through personal contact, mail, or e-mail.
(b) An owner may delegate the owner's responsibility under paragraph (a) to the owner's consultant or contractor, as those terms are defined in section 115C.02, or to the operator of the tank.
History: 2008 c 357 s 35