Sec. 11529.
(1) A disposal area that is a solid waste transfer facility is not subject to the construction permit and operating license requirements of this part if either of the following circumstances exists:
(a) The solid waste transfer facility is not designed to accept wastes from vehicles with mechanical compaction devices.
(b) The solid waste transfer facility accepts less than 200 uncompacted cubic yards per day.
(2) A solid waste transfer facility that is exempt from the construction permit and operating license requirements of this part under subsection (1) shall comply with the operating requirements of this part and the rules promulgated under this part.
(3) Except as provided in subsection (5), a disposal area that is an incinerator may, but is not required to, comply with the construction permit and operating license requirements of this part if both of the following conditions are met:
(a) The operation of the incinerator does not result in the exposure of any solid waste to the atmosphere and the elements.
(b) The incinerator has a permit issued under part 55.
(4) A disposal area that is an incinerator that does not comply with the construction permit and operating license requirements of this part as permitted in subsection (3) is subject to the planning provisions of this part and must be included in the county solid waste management plan for the county in which the incinerator is located.
(5) A disposal area that is a municipal solid waste incinerator that is designed to burn at a temperature in excess of 2500 degrees Fahrenheit is not subject to the construction permit requirements of this part.
History: 1994, Act 451, Eff. Mar. 30, 1995 ;-- Am. 1996, Act 358, Eff. Oct. 1, 1996 Popular Name: Act 451Popular Name: NREPAPopular Name: Solid Waste Act