Sec. 580.
Plans for the alteration or construction of any bridge, road, pipe line, power line, drain, sewer or other public and private construction in, into or across any right of way or in, into or across any drain, channel, dike, reservoir or other works owned, constructed and controlled by a water management district shall be submitted to the board prior to construction, and the board is hereby authorized to prescribe the manner in which such public or private works shall cross, be adjusted to or connected with any right of way, channel, dike, reservoir or other construction owned or controlled by the district.
History: 1956, Act 40, Imd. Eff. Mar. 28, 1956 Popular Name: Act 40