§ 7-202. Electric companies -- Power plant sites

MD Pub Util Code § 7-202 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

(a)    If the Commission determines that a site is needed, the Commission, on its own motion, may request the Secretary of Natural Resources to purchase a power plant site as provided in Title 3, Subtitle 3 of the Natural Resources Article.

(b)    In determining whether a need exists for the State to purchase a power plant site, the Commission shall consider:

(1)    the suitability of sites owned by an electric company, both within and outside the State;

(2)    the anticipated growth of electric power demand and the alternative means and locations for meeting that demand, both within and outside the State; and

(3)    any other factors required by law.

(c)    (1)    The Commission may determine that a power plant site is needed only after the Commission gives public notice and holds a public hearing.

(2)    The hearing shall be held in the legislative district in which the site under consideration is located.