8-23-9-24. Survey monuments; procedure upon removal or burial

IN Code § 8-23-9-24 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 24. If in the construction or maintenance of a state highway it is necessary to remove or bury a monument marking or evidencing an established corner, the department shall cause to be set in the pavement or right-of-way at the place where the monument was located a monument capable of activating a metal detection device. The top of the monument must be level with the pavement or the grade of the right-of-way. The department shall cause a memorandum of the monument to be filed in the county surveyor's office of the county.

As added by P.L.18-1990, SEC.218.