8-1-8.8-8.7. "Qualified utility system expenses"

IN Code § 8-1-8.8-8.7 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 8.7. As used in this chapter, "qualified utility system expenses" means the costs associated with the study, analysis, or development of a life cycle management project for a nuclear energy production or generating facility.

As added by P.L.150-2011, SEC.8.