8-1-5.5-1. Transfer of authority to supply piped drinking water to person other than city or town; time of test; rules

IN Code § 8-1-5.5-1 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 1. Within thirty (30) days before the date that the authority to supply piped drinking water is transferred from a city or town to a person other than a city or town, the state department of health shall conduct a test to determine the quality of the drinking water supplied by the city or town. The state department of health shall adopt rules under IC 4-22-2 concerning the test that is required under this section.

As added by Acts 1981, P.L.105, SEC.1. Amended by P.L.2-1992, SEC.79.