22-15-3-1. Issuance; plan review by county or municipality; expiration

IN Code § 22-15-3-1 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 1. (a) The state building commissioner or a city, town, or county certified under subsection (d) shall issue a design release for the construction of a Class 1 structure to an applicant who qualifies under section 2 or 3 of this chapter.

(b) The state building commissioner shall issue a design release for the fabrication of an industrial building system or mobile structure under section 4 of this chapter.

(c) A design release issued under this chapter expires on the date specified in the rules adopted by the commission.

(d) The commission may certify a city, town, or county as qualified to issue design releases, if the city, town, or county:

(1) is competent under the commission's objective criteria; and

(2) has adopted the rules of the commission under IC 22-13-2-3.

(e) A city, town, or county that is certified by the commission under subsection (d) may issue design releases. A design release issued by a certified city, town, or county must be:

(1) in accordance with the commission's objective criteria; and

(2) for a construction type for which the city, town, or county is certified.

All records held by a certified city, town, or county that pertain to the design release must be submitted to the division to be held in a central repository.

As added by P.L.245-1987, SEC.4. Amended by P.L.22-2005, SEC.44; P.L.218-2014, SEC.12; P.L.49-2016, SEC.7.