14-30-4-17. Rules

IN Code § 14-30-4-17 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 17. The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.

As added by P.L.35-2001, SEC.7.