Sec. 14. In developing the plan, the commission shall determine the best method and manner of establishing flood control, giving consideration to the following:
(1) The reservoir method.
(2) The channel improvement method.
(3) The levee method.
(4) Flood plain regulation.
(5) All nonstructural methods.
As added by P.L.35-2001, SEC.7.