13-17-10-2. Study required

IN Code § 13-17-10-2 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

Sec. 2. The commissioner may not:

(1) issue; or

(2) consider an application for;

a permit specifically authorizing the incineration of PCB until the study required by section 3 of this chapter is concluded.

[Pre-1996 Recodification Citation: 13-7-16.5-9(c).]

As added by P.L.1-1996, SEC.7.