§ 8-2-164. License required; permit purchase

GA Code § 8-2-164 (2018) (N/A)
Copy with citation
Copy as parenthetical citation

(1) Any installer performing any installation of a manufactured home or a mobile home in this state shall first obtain a license from the Commissioner; provided, however, that persons employed by or contracting with a licensed installer to perform installations shall not be required to obtain such license; and

(2) In addition to the requirements of paragraph (1) of this Code section, any installer performing any installation of any new or pre-owned manufactured or mobile home in this state shall first purchase a permit from the Commissioner. The cost of such permit shall be $60.00 for each manufactured or mobile home. Each installer shall provide any information required by the Commissioner to be submitted to obtain a permit. A permit shall be attached by the installer to the panel box of each manufactured or mobile home upon completion of installation.