§ 12-58-114.5. Inspection - application - standards

CO Rev Stat § 12-58-114.5 (2018) (N/A)
Copy with citation
Copy as parenthetical citation

(1) Any plumbing or gas piping installation in any new construction or remodeling or repair, other than manufactured units inspected in accordance with the provisions of part 7 of article 32 of title 24, C.R.S., except for such new construction or remodeling or repair in any incorporated town or city, county, city and county, or in a building owned or leased or on land owned by a qualified state institution of higher education where such local entity or qualified state institution of higher education conducts inspections and issues permits, must be inspected by a state plumbing inspector. A state plumbing inspector shall inspect any new construction, remodeling, or repair subject to the provisions of this subsection (1) within three working days after the receipt of the application for inspection. Prior to the commencement of any such plumbing or gas piping installation, the person making such installation shall apply for a permit and pay the required fee. Every mobile home or movable structure owner shall have the plumbing and gas piping hookup for such mobile home or movable structure inspected prior to obtaining new or different plumbing or gas service. A qualified state institution of higher education with a building department that meets or exceeds the minimum standards adopted by the board under this article shall process applications for permits and inspections only from the institution and from contractors working for the benefit of the institution, and shall conduct inspections only of work performed for the benefit of the institution. Each inspection must include a contemporaneous review to ensure that the requirements of section 12-58-105 have been met. A qualified state institution of higher education shall enforce standards that are at least as stringent as any minimum standards adopted by the board.

(2) A state plumbing inspector shall inspect the work performed, and, if such work meets the minimum standards set forth in the Colorado plumbing code referred to in section 12-58-104.5, a certificate of approval shall be issued by the inspector. If such installation is disapproved, written notice thereof together with the reasons for such disapproval shall be given by the inspector to the applicant. If such installation is hazardous to life or property, the inspector disapproving it may order the plumbing or gas service thereto discontinued until such installation is rendered safe. The applicant may appeal such disapproval to the board and shall be granted a hearing by the board within seven days after notice of appeal is filed with the board. After removal of the cause of such disapproval, the applicant shall make application for reinspection in the same manner as for the original inspection and pay the required reinspection fee.

(3) (a) All inspection permits issued by the board are valid for a period of twelve months. The board shall close a permit and mark its status as "expired" at the end of the twelve-month renewal period, except in the following circumstances:

(I) If an applicant makes a showing at the time of application for a permit that the plumbing or gas piping work is substantial and is likely to take longer than twelve months, the board may issue a permit to be valid for a period longer than twelve months, but not exceeding three years.

(II) If the applicant notifies the board prior to the expiration of the twelve-month period of extenuating circumstances, as determined by the board, during the twelve-month period, the board may extend the validity of the permit for a period not to exceed six months.

(b) If an inspection is requested by an applicant after a permit has expired or has been cancelled, a new permit must be applied for and granted before an inspection is performed.

(4) Each application, certificate of approval, and notice of disapproval shall contain the name of the property owner, if known, the location and a brief description of the installation, the name of the general contractor if any, the name of the plumbing contractor or licensed plumber and state license number in the case of any plumbing installation, the name of the installer in the case of any liquefied petroleum gas piping installation, the state plumbing inspector, and the inspection fee charged for the inspection. The original of a notice of disapproval and written reasons for disapproval and corrective actions to be taken shall be mailed to the board, and a copy of such notice shall be mailed to the plumbing contractor in the case of any plumbing installation or the installer in the case of any liquefied petroleum gas piping installation, within two working days after the date of inspection, and a copy of the notice shall be posted at the installation site. Such forms shall be furnished by the board, and a copy of each application, certificate, and notice made or issued shall be filed with the board.

(5) Notwithstanding the fact that any incorporated town or city, any county, or any city and county in which a public school is located or is to be located has its own plumbing code and inspection authority, any plumbing or gas piping installation in any new construction or remodeling or repair of a public school shall be inspected by a state plumbing inspector.

(6) If an incorporated town or city, county, city and county, or qualified state institution of higher education intends to commence or cease performing plumbing or gas piping inspections in its respective jurisdiction, or for its buildings owned or leased or on its land, written notice of such intent must be given to the board.

(7) (a) Any person claiming to be aggrieved by the failure of a state plumbing inspector to inspect his property after proper application or by notice of disapproval without setting forth the reasons for denying the inspection permit may request the program administrator to review the actions of the plumbing inspector or the manner of the inspection. Such request may be made by his authorized representative and shall be in writing.

(b) Upon the filing of such a request, the program administrator shall cause a copy thereof to be served upon the state plumbing inspector complained of, together with an order requiring such inspector to answer the allegations of said request within a time fixed by the program administrator.

(c) If the request is not granted within ten days after it is filed, it may be treated as rejected. Any person aggrieved by the action of the program administrator in refusing the review requested or in failing or refusing to grant all or part of the relief requested may file a written complaint and request for a hearing with the board, specifying the grounds relied upon.

(d) Any hearing before the board shall be held pursuant to the provisions of section 24-4-105, C.R.S.

(8) (a) If an incorporated town or city, county, city and county, or qualified state institution of higher education intends to commence or cease performing plumbing inspections in its jurisdiction or for the buildings owned or leased by or on land of a qualified state institution of higher education, it shall commence or cease the same only as of July 1 of any year, and written notice of such intent must be given to the board on or before October 1 of the preceding calendar year. If such notice is not given and the use of state plumbing inspectors is required within the respective jurisdiction or building affected by the notice requirement, the respective local government or qualified state institution of higher education of the respective jurisdiction or building requiring such inspections shall reimburse the board for any expenses incurred in performing such inspections, in addition to transmitting the required permit fees.

(b) Repealed.

(9) A qualified state institution of higher education may choose not to require fees as part of the permitting process. A documented permitting and inspection system must be instituted by each qualified state institution of higher education as a tracking system that is available to the board for the purpose of investigating any alleged violation of this article. The permitting and inspection system must include information specifying the project, the name of the inspector, the date of the inspection, the job site address, the scope of the project, the type of the inspection, the result of the inspection, the reason and applicable code sections for partially passed or failed inspections, and the names of the contractors on the project who are subject to inspection.