Section 7262.

CA Labor Code § 7262 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

When gathering and stacking temporary floor planks from the last panel, the steel erector’s personnel assigned to such work shall be protected by safety belts with life lines attached to a catenary line or other substantial anchorage.

(Added by Stats. 1970, Ch. 1498.)