§ 963.10 - Scope.

Copy with citation
Copy as parenthetical citation

The scope of this subpart includes the following for both the preclosure and postclosure periods:

The bases for the suitability determination for the Yucca Mountain site as a location for a geologic repository;

The suitability evaluation methods for applying the site suitability criteria to a geologic repository at the Yucca Mountain site; and

The site suitability criteria that DOE will apply in accordance with section 113(b)(1)(A)(iv) of the NWPA.

DOE will seek NRC concurrence on any future revisions to this subpart.