To address the requirements under paragraph (1), each installation master plan shall include consideration of—
(1) At a time interval prescribed by the Secretary concerned (but not less frequently than once every 10 years), the commander of each major military installation under the jurisdiction of the Secretary shall ensure that an installation master plan is developed to address environmental planning, sustainable design and development, sustainable range planning, real property master planning, and transportation planning.
To address the requirements under paragraph (1), each installation master plan shall include consideration of—
(A) planning for compact and infill development;
(B) horizontal and vertical mixed-use development;
(C) the full lifecycle costs of real property planning decisions;
(D) capacity planning through the establishment of growth boundaries around cantonment areas to focus development towards the core and preserve range and training space; and
(E) energy and climate resiliency efforts.
The transportation component of the master plan for a major military installation shall be developed and updated in consultation with the metropolitan planning organization designated for the metropolitan planning area in which the military installation is located.
(1) The transportation component of the master plan for a major military installation shall be developed and updated in consultation with the metropolitan planning organization designated for the metropolitan planning area in which the military installation is located.
(2) To address the requirements under subsection (a) and paragraph (1), each installation master plan shall include consideration of ways to diversify and connect transit systems.
Nothing in this section shall supersede the requirements of section 2859(a) of this title.
In this section:
(1) The term “major military installation” has the meaning given to the term “large site” in the most recent version of the Department of Defense Base Structure Report issued before the time interval prescribed for development of installation master plans arises under subsection (a).
(2) The terms “metropolitan planning area” and “metropolitan planning organization” have the meanings given those terms in section 134(b) of title 23 and section 5303(b) of title 49.
(3) The term “energy and climate resiliency” means anticipation, preparation for, and adaptation to utility disruptions and changing environmental conditions and the ability to withstand, respond to, and recover rapidly from utility disruptions while ensuring the sustainment of mission-critical operations.
(Added Pub. L. 112–239, div. B, title XXVIII, § 2802(a), Jan. 2, 2013, 126 Stat. 2147; amended Pub. L. 113–66, div. B, title XXVIII, § 2811, Dec. 26, 2013, 127 Stat. 1013; Pub. L. 115–232, div. B, title XXVIII, § 2805(d), Aug. 13, 2018, 132 Stat. 2263.)