(a) In this subtitle the following words have the meanings indicated.
(b) (1) “Major project” means an extension, project, or program of water and sewer facilities.
(2) “Major project” includes:
(i) a sewer main at least 15 inches in diameter;
(ii) a water main at least 16 inches in diameter; and
(iii) a sewage or water pumping station, force main, and storage or other major facility.
(3) “Major project” does not include a sewer main or water main that:
(i) provides only local service;
(ii) is 2,000 feet or less; and
(iii) is built to avoid unnecessary and uneconomical duplication when a major project is constructed.
(c) “Program” means a 6–year projected program by the Commission of capital improvements for water and sewer facilities.