Sec. 29.55.120. Review required.

AK Stat § 29.55.120 (2019) (N/A)
Copy with citation
Copy as parenthetical citation

The record owner of property on which an assessment is imposed under AS 29.55.105 shall obtain from an independent, third- party qualified energy auditor the following:

(1) for each proposed energy improvement project,

(A) a review of the energy or emissions baseline conditions, as appropriate; and

(B) the projected reduction in energy costs, energy consumption or demand, or emissions affecting local air quality, as appropriate; and

(2) for each completed energy improvement project, verification that the energy improvement project was properly completed and is operating as intended.